InfrastructureIllustrative record
Urban Water & Drainage Corridor
Replacement water mains, a new trunk sewer and stormwater upgrades along live city streets, with trenchless crossings and full carriageway reinstatement.
01Project overview
The scope, in context
The corridor renews ageing networks under busy roads. Open-cut is used where possible and trenchless methods at major crossings, with utilities located and protected ahead of the works.
Traffic staging, short possession windows and prompt reinstatement keep disruption contained through residential and commercial frontages.
02Key highlights
At a glance
- Network length
- [00] km combined
- Crossings
- [0] trenchless
- Environment
- Live urban streets
- Procurement
- Municipal tender
03Execution scope
What delivery covers
- Water distribution mains and valves
- Trunk sewer and manholes
- Stormwater drains and gully connections
- Trenchless road and rail crossings
- Service connections and chambers
- Carriageway and footpath reinstatement
04Technical details
Method and systems
- Methods
- Open-cut + microtunnelling
- Pipe
- DI / HDPE / RCC as specified
- Reinstatement
- To municipal standard
- Billing
- Measured, running-account
05Imagery
Representative site imagery
Representative stock photography — not images of this scope.
Delivered with
Services on this project
More work
Related projects
Start a conversation
Have an infrastructure project in mind?
Talk to our team about engineering, EPC and project execution — from early feasibility to a tendered, buildable scope.
